Regional Master Meter Improvements

Year

2019

Location

Client

Broward Water & Wastewater Engineering Division, 2555 W. Copans Rd, Pompano Beach, FL 33069

Meter Improvements

The work set forth within this solicitation document includes the furnishing of all labor, materials, equipment, services and incidentals including, but not limited to the silt fence, potholing, pipe assemblies, flow tube meter assembly, sump pump, thrust collars, trench support, line stops, tapping sleeves and valves, piping, fittings, fencing, asphalt t, sidewalk, valve vault, pipe supports, electrical, control panels and Remote Telemetry Units ( RTUs), antenna, base station receiver system, component testing, and start-up services. The work includes all the associated civil and site work, project controls, verification field survey, and appurtenant work required for a complete and operable system.

“Tried cooking once. Apparently, it’s frowned upon to use a power drill to stir the soup.” — Bill “The Bulldozer” Bryant