Projects

Trenchless & Specialized Methods

Our trenchless division delivers cost-effective and low-disruption installation solutions using advanced technologies such as horizontal directional drilling (HDD), jack and bore, microtunneling, and pipe bursting. These innovative methods allow DMSI to install or replace underground utilities beneath roadways, waterways, and other sensitive areas while minimizing surface impact and community disruption.

Biscayne Point Neighborhood Right-Of-Way Improvements

Design and Build

See Project

Sunset Islands

II Neighborhood Improvements Project

See Project

Rehabilitation

of West Bridge & Bear Cut Bridge

See Project

FDOT – SR No. 907,

SR No. 907, Alton Road, from 5th Street to Michigan Avenue

See Project

Rickenbacker

Causeway 20-Inch Water Main via Horizontal Directional Drill

See Project

City of Miami

Beach Pump stations 10th and 14th Streets

See Project

Replacement of

Existing 54-Inch Sanitary Sewer Force Main Pipeline

See Project

63rd Street

Water Main Replacement Project

See Project

Water & Sewer Infrastructure

DMSI specializes in the installation and replacement of water mains, force mains, gravity sewer systems, and pump stations. Our team delivers complex utility projects that ensure reliable water distribution and wastewater collection throughout South Florida.

Design-Build

Services for Two 24-Inch Directional Drills

See Project

Water Main

and Force Main Intracoastal Waterway Crossings at E. Las Olas Blvd

See Project

Design Build

Design-Build Services to furnish and install a 48-Inch Diameter Transmission Main for “Area N”

See Project

Indian Creek Drive

Indian Creek Drive from 25th Street to 32nd Street

See Project

Installation of 54-Inch

Installation of 54-Inch HDPE and PCCP Sewer along Euclid Avenue, Miami Beach

See Project

Port of Miami

Port of Miami – 42-Inch Water Main; Twin 30-Inch Horizontal Directional Drill

See Project

Emergency Repairs to 72-Inch

Emergency Repairs to 72-Inch and 54-Inch PCCP Force Main – RPQ P0221

See Project

Regional Master Meter

Regional Master Meter Improvements

See Project

Drainage & Stormwater Improvements

We provide comprehensive stormwater solutions including new drainage systems, culvert replacements, and flood-mitigation infrastructure. Each project is designed to improve roadway safety, enhance stormwater flow, and protect surrounding communities.

Emergency Culvert Replacement

Emergency Culvert Replacement at SW 137 Ave and Bird Road

See Project

Emergency Culvert

Replacement at SW 137 Ave and Bird Road

See Project

Emergency Replacement

48-Inch Force Main Crossing the Oleta River

See Project

Lake Osborne Estates

Lake Osborne Estates Water Main Phase I Project

See Project

Site & Civil Improvements

From park enhancements to seawall reconstruction, DMSI’s site and civil improvement projects focus on building durable and aesthetically pleasing community assets that enhance public spaces and waterfront protection.

Emergency Culvert Replacement

Emergency Culvert Replacement at SW 137 Ave and Bird Road

See Project

Emergency Culvert

Replacement at SW 137 Ave and Bird Road

See Project

Emergency Replacement

48-Inch Force Main Crossing the Oleta River

See Project

Lake Osborne Estates

Lake Osborne Estates Water Main Phase I Project

See Project

Design-Build Projects

DMSI successfully manages complete design-build delivery—integrating engineering, permitting, and construction under one roof. We team up with top engineering firms to develop innovative, cost-effective solutions that optimize project performance, accelerate delivery, and add long-term value to the community.

Emergency Culvert Replacement

Emergency Culvert Replacement at SW 137 Ave and Bird Road

See Project

Emergency Culvert

Replacement at SW 137 Ave and Bird Road

See Project

Emergency Replacement

48-Inch Force Main Crossing the Oleta River

See Project

Lake Osborne Estates

Lake Osborne Estates Water Main Phase I Project

See Project