Biscayne Point Neighborhood Right-Of-Way Improvements Project
Year: 2012
Client: City of Miami Beach 1700 Convention Center Dr, Miami Beach, FL 33139
Design-build Improvement
This design-build neighborhood improvement project is in the City of Miami Beach with identical geological ground conditions and maintenance of vehicular and pedestrian traffic.
The project included extensive underground utility construction of over 24,000 LF of 8″ to 16″ DIP water main. Deep shaft construction for the installation of o drainage pump station. The project required pipe tapping at several locations to tie in the new water main.
A storm water collection system consisting of over 8,500 LF of drainage collection from 18″ to 48″ Diameter, l drainage pump station, over 1,000 LF of 24″ PVC sewer and l 0 drainage wells. Limits of excavation for the pipe and structures varied in depth from 5 ft. to 13 ft., and dewatering of the trenches via pumps was utilized as the water table began about 2-3 ft. below ground surface.
See Other Projects
![Emergency Culvert Replacement at SW 137 Ave and Bird Road](https://teamdmsi.com/wp-content/uploads/2024/05/Emergency-Culvert-Replacement-at-SW-137-Ave-and-Bird-Road-510x382.jpg)
![Regional Master Meter Improvements](https://teamdmsi.com/wp-content/uploads/2024/05/Regional-Master-Meter-Improvements.jpg)
![Emergency Repairs to 72-Inch and 54-Inch PCCP Force Main](https://teamdmsi.com/wp-content/uploads/2024/05/Emergency-Repairs-to-72-Inch-and-54-Inch-PCCP-Force-Main.jpg)
![Emergency Replacement of 48-Inch Force Main Crossing the Oleta River](https://teamdmsi.com/wp-content/uploads/2024/05/Emergency-Replacement-of-48-Inch-Force-Main-Crossing-the-Oleta-River.jpg)
![Lake Osborne Estates Water Main Phase I](https://teamdmsi.com/wp-content/uploads/2024/05/Lake-Osborne-Estates-Water-Main-Phase-I.jpg)
![Port of Miami – 42-Inch Water Main; Twin 30-Inch Horizontal Directional Drill](https://teamdmsi.com/wp-content/uploads/2024/05/port-of-miami-42-inch-water-main.jpg)
![Installation of 54-Inch HDPE and PCCP Sewer](https://teamdmsi.com/wp-content/uploads/2024/05/Installation-of-54-Inch-HDPE-and-PCCP-Sewer.jpg)
![Indian Creek Drive from 25th Street to 32nd Street](https://teamdmsi.com/wp-content/uploads/2024/05/Indian-Creek-Drive-from-25th-Street-to-32nd-Street-wide.jpg)
![Design-Build Services to Furnish and Install a 48-Inch Diameter Transmission Main for “Area N”](https://teamdmsi.com/wp-content/uploads/2024/05/Design-Build-Services-to-furnish-and-install-a-48-Inch-Diameter-Transmission-Main-for-Area-N.jpg)
![Water Main and Force Main Intracoastal Waterway Crossings at E. Las Olas Blvd](https://teamdmsi.com/wp-content/uploads/2024/05/Water-Main-and-Force-Main-Intracoastal-Waterway-Crossings-at-E.-Las-Olas-Blvd.jpg)
![Design-Build Services for Two 24-Inch Directional Drills](https://teamdmsi.com/wp-content/uploads/2024/05/Design-Build-Services-for-Two-24-Inch-Directional-Drills.jpg)
![63rd Street Water Main Replacement Project](https://teamdmsi.com/wp-content/uploads/2024/05/63rd-Street-Water-Main-Replacement-Project.jpg)
![Replacement of Existing 54-Inch Sanitary Sewer Force Main Pipeline](https://teamdmsi.com/wp-content/uploads/2024/05/Replacement-of-existing-54-Inch-sanitary-sewer-force-main-pipeline.jpg)
![City of Miami Beach Pump Stations 10th and 14th Streets](https://teamdmsi.com/wp-content/uploads/2024/05/City-of-Miami-Beach-Pump-stations-10th-and-14th-Streets.jpg)
![Rickenbacker Causeway 20-Inch Water Main via Horizontal Directional Drill](https://teamdmsi.com/wp-content/uploads/2024/05/Rickenbacker-Causeway-20-Inch-Water-Main-via-Horizontal-Directional-Drill.jpg)