Biscayne Point Neighborhood Right-Of-Way Improvements Project

W

Year: 2012
Client: City of Miami Beach 1700 Convention Center Dr, Miami Beach, FL 33139

Design-build Improvement

This design-build neighborhood improvement project is in the City of Miami Beach with identical geological ground conditions and maintenance of vehicular and pedestrian traffic.

The project included extensive underground utility construction of over 24,000 LF of 8″ to 16″ DIP water main. Deep shaft construction for the installation of o drainage pump station. The project required pipe tapping at several locations to tie in the new water main.

A storm water collection system consisting of over 8,500 LF of drainage collection from 18″ to 48″ Diameter, l drainage pump station, over 1,000 LF of 24″ PVC sewer and l 0 drainage wells. Limits of excavation for the pipe and structures varied in depth from 5 ft. to 13 ft., and dewatering of the trenches via pumps was utilized as the water table began about 2-3 ft. below ground surface.

“Brick by brick, stone by stone, every great thing was built by those who believed they could.” — Tom “The Mason” Mitchell

Contact Us

2601 Wiles Road, Pompano Beach, FL 33073

2655 South Le Jeune Rd, Suite 545 Coral Gables 33134

(954) 977-3556

adminasst@dmsi.co