City of Miami Beach Pump stations 10th and 14th Streets

Year: 2014
Client: City of Miami Beach; Bergeron (Prime Contractor), 19612 SW 69th Place Fort Lauderdale FL 33332

Underground Utility Construction

The project consists of underground utility construction, protecting primary FPL duct banks feeding the entire City of Miami Beach. For David Mancini & Sons, Inc. to design the deep shaft construction, the existing FPL was exposed, allowing us to assess the ultimate location of the 35-foot-deep shaft placement; we then installed (2) new stormwater pump stations for the City of Miami Beach.

Each pump station consisted of a diversion box, dissipater box, wet well, grate box, (3) junction boxes, a drainage defender box, 72-inch reinforced concrete pipe, and [4) Flygt CP 350l pumps. This project also contained storm water collection, disposal, tide flex valves, mechanical piping, and control pane! Site concrete involves pouring major slobs for electrical, thrust block, and minor appurtenances.

“Every structure we build is a monument to the power of human imagination and hard work.” — Susan “The Surveyor” Sanders

Contact Us

2601 Wiles Road, Pompano Beach, FL 33073

2655 South Le Jeune Rd, Suite 545 Coral Gables 33134

(954) 977-3556

adminasst@dmsi.co